VONK is proud to announce the successful completion the factory acceptance test of the first emergency power units for a Liquefied Natural Gas plant in Brunei.
This unique design was made by VONK to meet our client specific needs. The power generation unit is installed in a container building at ground level while the power distribution unit is
installed on top. This stacked design reduces the required plot space significantly and is very suitable for sites with space constraints. The first set has now been manufactured , fully tested and will begin the journey to Brunei for installation in early 2020.
The site installation and construction activities will be executed by our team in Brunei together with our local partner Zainal Daud.